Perfection of method calculation of rekonfigurated mine ventilanion systems with the use of parallel calculations / Bunko, T. V., Kokoulin, I. E., Zhalilov, A. Sh., Bokij, A. B. (2014)
| Geo-Technical Mechanics / Issue (2014, 119)
Bunko T. V., Kokoulin I. E., Zhalilov A. Sh., Bokij A. B. Perfection of method calculation of rekonfigurated mine ventilanion systems with the use of parallel calculations
Cite: Bunko, T. V., Kokoulin, I. E., Zhalilov, A. Sh., Bokij, A. B. (2014). Perfection of method calculation of rekonfigurated mine ventilanion systems with the use of parallel calculations. Geo-Technical Mechanics, 119, 87-99. http://jnas.nbuv.gov.ua/article/UJRN-0000842993 [In Russian]. |
|
|